I have 30 years of experience, and specialize in the field of construction with specific knowledge in the areas of delay analysis, cost analysis and causation analysis. I have published on such topics as electrical cost estimating, delay claim analysis and construction claim analysis. I have testified 20 times on topics such as cost analysis, general conditions and delay analysis. I provided professional testimony on electrical specifications.